The Saint George Temple renovation focused on updating the historic Temple that was originally constructed in 1877. This 141,700 square-foot temple renovation is extensive, requiring upgraded electrical throughout, a new stair tower, two new elevators, new annex and site upgrades. This historical building requires careful planning to preserve the high-profile elements during the renovation. Our scope of work on this project included all division 26, 27, and 28 work which includes the lighting, power, A/V, security, fire alarm, and tele-data systems.
- Church News