Airport Terminal Phases 1, 2, & 3
Wilkinson Electric provided the electrical scope for the passenger terminal at Provo Municipal Airport, a 309,000-square-foot facility. The project required a complete electrical buildout, including primary service distribution, main switchgear, transformers, and panelboards designed to support ticketing areas, TSA screening, baggage handling systems, airline operations, concessions, and administrative offices. Careful coordination with the City of Provo, Jacobson Construction, and utility provider ensured the terminal was equipped with sufficient capacity for both current airline operations and future expansion phases.
The interior electrical scope included architectural and LED lighting for key areas throughout the building. Dedicated circuits were installed for major equipment, such as baggage conveyor systems, screening equipment, and tenant spaces. Emergency power and life-safety systems were put in place to meet code requirements and ensure smooth operation during peak travel periods. In addition to power distribution, the project included comprehensive low-voltage infrastructure such as fire alarm systems, security cameras, access control, communications cabling, and exterior site lighting.
Wilkinson Electric was an outstanding partner throughout the first phase of the Provo Airport Terminal project. Their team consistently demonstrated professionalism, exceptional customer service, and a collaborative approach that contributed significantly to the project's success. They were proactive in developing innovative solutions to complex challenges and worked closely with the airport, contractors, and project stakeholders to identify the most efficient and cost-effective approaches without compromising quality or safety. Their responsiveness, technical expertise, and willingness to adapt to changing project needs made them a trusted partner from start to finish. Wilkinson Electric's commitment to excellence and teamwork played an important role in delivering a successful project, and we would confidently recommend them for future projects.
- Matt Jensen, Provo Airport Operations Manager